| Designed capacity | 2Mt/a |
| Startup | 2006 |
| Scope of Contract | Engineering design |
| Designed capacity | 4.64Mt/a |
| Startup | 2009 |
| Scope of Contract | Engineering design |
| Designed capacity | 3Mt/a |
| Startup | 2005 |
| Scope of Contract | EPC |
| Awarded National Copper Key Prize of Excellence in EPC | |
| Designed capacity | 3.115Mt/a |
| Startup | 2008 |
| Scope of Contract | Engineering design |
| Designed capacity | 3.6Mt/a |
| Startup | 2007 |
| Scope of Contract | EP |