On March 26, 2017, the coal silos engineered by CISDI went through commissioning at the material yard of Baosteel, China, and performed fully automatic charging and discharging under remote control. The coal silos are designed with an inner diameter of 24m each. With the top platform 46 meters high, each of the silos has an effective storage up to 11,000t, the largest ones in China.